Sewage Treatment Plant in Electronic City, Bangalore

Compact, plug-and-play STP and ETP systems for IT parks, apartments, hotels, and factories in Electronic City. KSPCB compliant. Installed in 1 week. Fits in 1 car parking space.

1 Week
Installation
15 m²
Min. Footprint
85%
Water Reuse
KSPCB
Compliant
Why Tigreen in Electronic City

The Smart STP Choice for Bangalore's Tech Corridor

Electronic City is one of India's densest tech and industrial hubs. Land is at an extreme premium. Traditional concrete STP plants are impractical. Tigreen is built for exactly this challenge.

Delivered Pre-Built

Our systems arrive fully assembled and tested. No major on-site construction work — no noise, no mess, no months of disruption to your operations.

1-Week Commissioning

Plumbing and electrical hookup is completed in 3–7 days. You get a compliant, operational STP weeks before a conventional civil system would even break ground.

KSPCB & CPCB Compliant

Meets Karnataka Pollution Control Board discharge norms for STPs and ETPs, ensuring your NOC, BBMP clearances, and factory licenses stay intact.

85% Water Reuse

Treated effluent can be reused for toilet flushing, cooling towers, and landscape irrigation — drastically cutting BWSSB water bills in your facility.

1 Car Park Space

From 20 KLD to 140 KLD, every Tigreen unit fits within 15–20 m². Ideal for IT park plots, apartment basements, and even rooftop technical areas.

IoT Remote Monitoring

Real-time sensor dashboard lets your facility manager track flow rates, quality parameters, and alerts from any device — no dedicated STP operator needed.

Sectors We Serve in Electronic City

From SEZ campuses to residential apartments — one technology, every application.

IT Parks & SEZs

Special Economic Zones, large IT campuses needing KSPCB-compliant STP

Residential Apartments

BBMP-mandated STP for apartment complexes above 20 flats

Hotels & Serviced Apartments

Compact STP for hospitality properties in Koramangala, HSR, EC

Factories & Manufacturing

ETP for garment, electronics, and light manufacturing units

Real Installation

This is a Tigreen STP. It fits where your car parks.

The compact blue unit you see here is a fully operational 60 KLD sewage treatment plant. No excavation. No concrete. Just plug your inlet pipe and power connection — and it's treating water within days.

  • No building permit required for skid-mounted units
  • Odour-controlled closed system — no smell complaints
  • Produces reusable tertiary treated water
  • Manufacturer warranty and AMC support
Get a Site Assessment
Tigreen 60 KLD plug and play sewage treatment plant installed in Electronic City Bangalore
Tigreen 60 KLD Unit
Fits in a single car parking space

Questions About STP in Electronic City, Bangalore

Is there a sewage treatment plant supplier near Electronic City Bangalore?

Yes. Tigreen is a leading STP and ETP manufacturer and installer serving Electronic City Phase 1, Phase 2, Bommanahalli, and Singasandra. Our R&D unit is located in AECS Layout, just minutes from Electronic City.

How much space does a Tigreen STP need in Electronic City?

Tigreen plug-and-play STP systems require as little as 15 m² — equivalent to a single car parking space. No excavation or permanent civil construction is required, making it ideal for Electronic City IT parks and apartment complexes.

Can apartments in Electronic City use a Tigreen STP system?

Absolutely. Our modular STP systems are KSPCB compliant and designed for residential apartment buildings, gated communities, and commercial complexes. Typical apartment systems range from 20 KLD to 100 KLD.

How quickly can a Tigreen STP be installed in Bangalore?

Installation is typically completed in 3 to 7 working days. The system is manufactured and pre-tested at our facility, then delivered to your site as a fully assembled plug-and-play unit.

Need an STP Quote for Electronic City?

Our team visits your site in Electronic City within 48 hours. Free consultation, no obligations.