
Sewage & Effluent Treatment Plant in Oragadam
Tigreen designs, pre-builds, and installs compact, modular STP and ETP wastewater treatment plants for apartments, factories, tech parks, and hotels in Oragadam. TNPCB compliant. Fits in 1 car parking space.
Meeting TNPCB Norms in Oragadam with Pre-Built Systems
Wastewater discharge norms defined by the Tamil Nadu Pollution Control Board (TNPCB) require robust, reliable sewage treatment plants (STP) and effluent treatment plants (ETP). For facilities in Oragadam, conventional civil construction takes months, disrupts site logistics, and requires massive space footprints.
Tigreen offers a pre-engineered, factory-tested alternative. Our modular packaged units are manufactured at our state-of-the-art facility and shipped directly to your location in Oragadam as a complete plug-and-play system. No deep excavation, no permanent concrete pools, and complete commissioning in just 1 week.
Through our proprietary radical microbubble flotation technology, we guarantee up to 85% water recovery. The tertiary treated water is perfectly safe and compliant for reuse in landscape irrigation, flushing, and cooling towers, significantly cutting your fresh water tanker reliance.

Guaranteed Output Parameters vs. TNPCB Limits
Tigreen's advanced flotation and multi-barrier filtration system delivers treated water that consistently performs far better than standard local board thresholds.
| Wastewater Parameter | Unit | TNPCB Max Limit | Tigreen Guaranteed Output |
|---|---|---|---|
| pH Value | pH | 5.5 - 9.0 | 7.0 - 7.6 |
| Biological Oxygen Demand (BOD) | mg/L | < 10 | < 5 |
| Chemical Oxygen Demand (COD) | mg/L | < 50 | < 15 |
| Total Suspended Solids (TSS) | mg/L | < 10 | < 2 |
| Turbidity | NTU | < 2 | < 0.8 |
| Fecal Coliform | MPN/100ml | Nil | Undetectable |
Applications We Serve in Oragadam
Decentralized, modular water treatment catering to diverse residential, commercial, and industrial segments in the region.
Machining Factories
Emulsified oil cutting and chemical waste pre-treatment skids
Logistics Warehouses
Odourless staff STPs with dynamic capacity adjustment for shifts
Precision Coating
Phosphate and paint pre-treatment chemical ETPs
Frequently Asked Questions — Oragadam
What is the maintenance footprint of a Tigreen ETP in Oragadam?
Our skids require a minimal clear area of 20 to 30 square meters. The system is designed with slide-out modular filters and automated self-backwashing, ensuring maintenance checks take under 2 hours per week.
Does Tigreen provide regional AMC support for TNPCB compliance in Oragadam?
Yes. We offer annual maintenance contracts (AMC) that include monthly engineering audits, effluent lab-testing reports, and telemetry validation logs to support simple TNPCB renewals.
Ready to Setup a Space-Saving STP or ETP in Oragadam?
Get a localized quote and complete technical drawings matching TNPCB requirements for your project. Our engineers are ready to assist.