Tigreen wastewater recycling system in Nairobi
Nairobi · Kenya · International

Sewage & Effluent Treatment Plant in Nairobi

Tigreen designs, pre-builds, and installs compact, modular STP and ETP wastewater treatment plants for apartments, factories, tech parks, and hotels in Nairobi. NEMA compliant. Fits in 1 car parking space.

Global
Ocean Freight
15 w²
Skid Mounted
85%
Irrigation Reuse
NEMA
Approved
Local Compliance

Meeting NEMA Norms in Nairobi with Pre-Built Systems

Wastewater discharge norms defined by the National Environment Management Authority (Kenya) (NEMA) require robust, reliable sewage treatment plants (STP) and effluent treatment plants (ETP). For facilities in Nairobi, conventional civil construction takes months, disrupts site logistics, and requires massive space footprints.

Tigreen offers a pre-engineered, factory-tested alternative. Our modular packaged units are manufactured at our state-of-the-art facility and shipped directly to your location in Nairobi as a complete plug-and-play system. No deep excavation, no permanent concrete pools, and complete commissioning in just 1 week.

Through our proprietary radical microbubble flotation technology, we guarantee up to 85% water recovery. The tertiary treated water is perfectly safe and compliant for reuse in landscape irrigation, flushing, and cooling towers, significantly cutting your fresh water tanker reliance.

Tigreen prefabricated modular skid installed on flat concrete bed in Nairobi
Space-Efficient Skid Setup
Pre-engineered skid placed directly on flat concrete

Guaranteed Output Parameters vs. NEMA Limits

Tigreen's advanced flotation and multi-barrier filtration system delivers treated water that consistently performs far better than standard local board thresholds.

Wastewater ParameterUnitNEMA Max LimitTigreen Guaranteed Output
pH ValuepH6.5 - 8.57.0 - 7.6
Biological Oxygen Demand (BOD)mg/L< 10< 5
Chemical Oxygen Demand (COD)mg/L< 30< 15
Total Suspended Solids (TSS)mg/L< 10< 2

Applications We Serve in Nairobi

Decentralized, modular water treatment catering to diverse residential, commercial, and industrial segments in the region.

Gated Residential Estates

Decentralized sewage recycling for residential suburbs and apartments

Hotels & Eco-Lodges

Odourless, low-noise biological treatment skids for green hospitality

Light Manufacturing

Packaged ETP units for packaging, cosmetics, and food units

Educational Campuses

Low-maintenance institutional STPs for schools and universities

Frequently Asked Questions — Nairobi

Does Tigreen supply packaged STPs to Nairobi, Kenya?

Yes. We ship pre-engineered packaged systems via Mombasa Port, with on-site installation and commissioning completed in collaboration with local engineering partners.

Can the treated water be reused for irrigation in Kenya?

Yes. Our radical flotation technology removes all organic contaminants and pathogens, producing water that conforms to NEMA standards for agricultural and landscape irrigation.

What is the typical delivery schedule from Bangalore to Nairobi?

Manufacturing and factory wet-testing take 3 to 4 weeks. Ocean freight from Chennai or Cochin port to Mombasa port takes 12 to 15 days, followed by road transport to Nairobi.

Ready to Setup a Space-Saving STP or ETP in Nairobi?

Get a localized quote and complete technical drawings matching NEMA requirements for your project. Our engineers are ready to assist.